IC 74245 PDF

September 22, 2019   |   by admin

Lead Small Outline Integrated Circuit (SOIC), JEDEC MS, Wide. DM74LSSJ. M20D. Lead Small Outline Package (SOP), EIAJ TYPE II. 74LS, 74LS Datasheet, 74LS Octal Bus Transceiver Tri-State Datasheet, buy 74LS, 74LS pdf, ic 74LS Details, datasheet, quote on part number: . IC VOLTAGE DETECTOR V TO Specifications: Output: Open Drain or Open Collector ; Reset: Active.

Author: Zulkigore Kanris
Country: Mozambique
Language: English (Spanish)
Genre: Science
Published (Last): 28 December 2018
Pages: 497
PDF File Size: 11.61 Mb
ePub File Size: 16.30 Mb
ISBN: 973-2-53718-501-4
Downloads: 93957
Price: Free* [*Free Regsitration Required]
Uploader: Shagar

You thus noted that L1 can be ordered independently of the buffer which, not validated, does not intervene. How to make a site?

It is about the CDbinary asynchronous meter with 12 bitswhose synoptic diagram is represented figure The electric diagram of id circuit carried out is represented figure b, while the figure c represents its synoptic diagram. The meter can go ix 0 to 2 12 positions. 72445 boundaries 2, 3, 4, 5, 6, 7, 8 and 9 can be connected eight lines of A1 to A8and eight others can be connected to pins 18, 17, 16, 15, 14, 13, 12 and 11 of B1 with B8.

The door of entry NAND is followed of a trigger of Schmitt who is used to improve quality of the signal, then come two reversers which control the chain of dividers. This is symbolized by a bubble placed on the entry f1 in figure After iic sixteenth clock pulse, the incrementing of the indication of the bill-posters starts, this one being in hexadecimal code, of 00 to finish to FF at the end of counting. Observe what occurs on A8.

Return to the synopsis. The figure b represents the diagram of the electric circuit carried out.

Adopt the same procedure for the seven other ways in order to check correct operation. To check if the signal goes indeed from B8 towards A8repeat the same procedure as for the preceding case. High of page Preceding page Following page. Indeed, L0 still flickers, ordered by the signal coming from CP1 ; on the other hand L1 does not flicker any more. To carry out the following experiments, it will be necessary to use a meter.

  LENZE 8100 PDF

The table of figure 23 indicates the frequency and the period of the signals of the various stages of the meter and summarizes the test results. By basing you on the results obtained, you can build the table of operation of the bidirectional buffer indicated figure 17 which can be summarized schematically by figure It must be in position OFF at the time of its connection on the sector.

SN , Tube SN; R̦hre SN ID, IC РIntegra

L0 and L1 flicker then at the rate of 10 Hz. L and that, for this reason, it must be fed with a stable tension of 5 V. Will finally know that the circuit 74LS is a circuit of technology T. A higher tension could damage it.

IC 74LS245/74245 DIP20

Static page of welcome. The stitching of this circuit is indicated on figure Carry out then the connections necessary. As you can note it, the frequencies spread out of 5 Hz with 0, Hzi. You can notice the sign represented inside each buffer ; it indicates that the buffers used comprise a circuit of re-arrangement of the trigger type of Schmitt.

Operational test of a Meter on 12 floors. Rock then SW1 on position 0 to validate the circuit again. On the twelve exits of Q1 with Q12one finds a number binary of twelve bits active of: The meter is incremented each time the entry f1 passes from the high level on the bottom grade, i.

Electronic forum and Infos. This is due to the fact that the exit of door 2 of figure 15 is at the high level whereas that of door 1 is on the bottom grade thus prohibiting the B8 direction towards A8. By observing the LED and the bill-posterscheck the correct operation of the meter by consulting the table of figure Forms maths Geometry Physics 1.

  CANON IR3235 SCAN TO PDF

Indeed, when SW0 is in position 1the passage of the signal in iv direction 744245 A8 with B8 is authorized. Of course, it is not a question to hope the clock pulses up to to check the table: Click here for the following lesson or in the synopsis envisaged to this end.

Now reverse the direction of transmission by applying the rectangular signal provided by CP1 to the B8 entry.

In this first phase, you will check the operation of the one of the eight bidirectional buffers of the integrated circuit. To carry out the experiments envisaged in this practice, it will be necessary for you to use the following material: Electronic forum and Poem.

It presents a luminosity weaker than the normal. It is thus enough to a little attention to observe the phenomenon and if there would remain some points obscure, do not hesitate to start again several times the experiment.

Dynamic page of welcome. To contact the author. By commenting on the experiment, one can say that each stage of the meter carries out a division by two of the frequency of the signal applied to its entry ; if one injects the signal with 10 Hzcoming from contact CP1at the entry f 1 of the meter, the various exits, one obtains signals whose frequency is each time reduced by half.