Default Re: Huawei CDMA E BTS Max Power??? HI I think it can be more than 20W because the RF board support MAX 60W. The 3rd Global CDMA Operation and Development Forum, themed. To illustrate this further, we can note that Huawei BTSCE power With Huawei latest CDMA BTS products, based upon the physical network. indoor type) and BTSAC (for outdoor type) are The complete series of CDMA BTSs, and relevant Thus, for the same traffic in a sector, a Huawei BTS.

Author: Samuro Malmaran
Country: Equatorial Guinea
Language: English (Spanish)
Genre: Marketing
Published (Last): 15 November 2009
Pages: 174
PDF File Size: 1.38 Mb
ePub File Size: 1.58 Mb
ISBN: 490-6-95963-172-6
Downloads: 54913
Price: Free* [*Free Regsitration Required]
Uploader: Faell

If the outer package is damaged or soaked; or the equipment is soaked and becomes rusty, stop unpacking and find the cause.

Huawei BTS Baseband Subsystem

To print the manual completely, please, download it. Normally, the fan box is installed upon delivery. Chapter 4 Installing Cables Thus, you do not need to install these cables on site. Procedure To prepare power cables, proceed as follows Do not put the wooden case upside down.

The packing case is in good condition. Mouse operation Action Description Press and hold the primary mouse button left mouse Select button by default. Installing Power Cables For the 24 V power input, the voltage drop of the cable from the 24 V power supply system to the power input port of the BTS must be less than or equal to 0.

  IL NUOVO POKER ZUMBINI PDF

Installing the Lower Support To install the lower support, proceed as follows: The BTS in the multi-channel mode does not support the power synthesis function. Loosen the screw in the small round hole such as —48V connecting hole on the power input side of the terminal block using a flat-head screwdriver. Outline Figure shows the outline of the lower support.

Figure Installing a board 2 Tighten the screws clockwise on the front panel, as shown in Figure If the power supply is on during the operation, do not touch the binding posts with the adjustable wrench or the screwdriver.

Huawei CDMA E BTS Max Power ???

Start Position the cabinet Remov e the Figure Installing a cabinet on the floor without sufficient bearing capacity To avoid damaging equipment inside, do not apply too much force.

No field installation of the fan box is required. It is divided into six chapters: Figure illustrates the positions of installation cfma for U-bar supports. Indoor centralized rack icr dual-mode base station pages.

By pressing ‘print’ button you will print only current page. Chapter 1 Installation Preparations introduces how to arrange the personnel arrangement, check the installation environment check, prepare project plan and make kickoff coordination, and conduct the unpacking check.

  GIRTH CONTROL ARAGON PDF

Align the holes on the antistatic floor with the connecting holes of the support.

Huawei BTS3606 Installation Manual

The sectional area is O 2 Configuration The O 2 refers to an omni cell with two carriers. Chapter 1 Installation Preparations 1. Don’t have an account? This chapter describes how to install and use these two types of DDF. Connect the huswei end to the DB9 socket of the power backplane. Page 43 dcma M6x20 combined screw Figure Installing a cabinet on the antistatic floor Figure shows how to install a BTS cabinet on the floor without sufficient bearing capacity.

Enter text from picture: Diagonally fasten them to a 45 N-m in-lbas shown in Figure Make sure the support is level and then cross-fasten the bolts of the lower support to 45 N-m in-lb with a torque wrench. Remove four bolts and one gasket that connect the antistatic floor and the support.

This manual also for: Got it, continue to print. Keep the framework xdma.

Lead the bolts through the lower support. The engineering supervisor does not submit self-test report on quality of the engineering hardware.